ONGOING CONSTRUCTION OF THE 1ST PHASE BUILDING

Reinforced concrete structure of the first building with 106 apartments is complete up to the 4th floor.

At the same time, craft-works and installation works are under way at the lower floors.

 

AB-zidovi-4-sprata

Reinforced concrete walls of the 4th floor and slab casting (24/04/2019)